DCD As-Built Drawings for a Showroom in D3, Dubai

This case study covers an AED 4,500 quotation, LML/QTN/1119-26 issued on 18 June 2026, to prepare DCD as-built drawings for a ground-floor showroom (GF 01) in Building 5 of Dubai Design District (D3). The fee covers a site visit, collecting the site as-built and existing drawings and details, and preparing the DCD drawings as per the regulations, with any required revision included.

2D drawings prepared for DCD approvals in Dubai for a showroom as-built set in D3
Preparing DCD as-built drawings for a showroom in Dubai Design District (D3)

Project facts

Authorities
Dubai Civil Defence
Quoted fee
AED 4,500
Scope
Site visit, as-built & DCD drawings
Status
Quotation issued

At a Glance

The core facts of this dcd as-built drawings preparation approval engagement at a glance.

Case study key facts
AttributeValue
Project typeDCD as-built drawings preparation
LocationBuilding 5, Dubai Design District (D3), Dubai
AuthorityDubai Civil Defence
Quoted feeAED 4,500
StatusQuote only
Source refLML/QTN/1119-26

The Challenge

Dubai Design District (D3) is a creative community of showrooms and design studios, and this ground-floor showroom at Building 5 needed an as-built drawing set prepared for DCD approval. Because the space had already been fitted out, the drawings had to record the built condition rather than the original layout, so the site visit and the collection of the existing as-built and construction drawings were the foundation of the set. The AED 4,500 fee is defined around inputs the client controls. The client supplies all other existing drawings, documents and green files; any revision required while preparing the DCD drawing set is included in the fee; exceptional approval requirements, an inspection failure or a design revision each carry an additional charge; VAT is separate; and the quotation notes that if an NOC is required from the building management, the price may differ. No fixed completion timeline is committed in the quotation.

The Approval Timeline

Tap a step for details

What We Did

The steps we followed to prepare and submit this approval — from drawing review to final submission.

  1. Conduct a site visit

    Visit the ground-floor showroom at Building 5, Dubai Design District (D3), and confirm the current built condition of the space.

  2. Collect as-built and existing drawings and details

    Gather the site as-built and existing drawings and details, together with the other existing drawings, documents and green files supplied by the client.

  3. Prepare the DCD drawing set as per regulations

    Prepare the DCD as-built drawings as per Dubai Civil Defence regulations so the set is ready for the DCD approval of the showroom.

  4. Incorporate required revisions

    Apply any revision required to finalise the DCD drawing set — revisions are included in the quoted AED 4,500 fee per quotation LML/QTN/1119-26.

  5. Confirm building management requirements

    Confirm whether an NOC from the building management is required, since quotation LML/QTN/1119-26 states the price may differ where it is.

  6. Finalise and hand over the approved drawing set

    Finalise the DCD-approved as-built drawing set; the final payment under the quotation is due upon receiving the final approval.

This project combined our 2D Drawings, Approval Management and Document Clearing services to deliver a single, tracked submission from drawings through final inspection.

Documents & Requirements

The documents prepared or collected for this Dubai Civil Defence submission, and who supplied each one.

Documents and requirements for this approval
DocumentDescriptionProvided by
Existing drawings, documents and green filesAll other existing drawings, documents and green files are to be given by the client, as stated in the limiting conditions of quotation LML/QTN/1119-26.Client
Site as-built drawings and detailsThe as-built and existing drawings and details of the showroom collected during the site visit.Client
Showroom access for the site visitAccess to the ground-floor showroom at Building 5, Dubai Design District (D3) so the site visit can be conducted.Client
Building management NOCIf required by the building management, the NOC is confirmed up front — quotation LML/QTN/1119-26 notes the price may differ where it is needed.Client
DCD as-built drawing setThe DCD drawings prepared as per Dubai Civil Defence regulations for the showroom approval.Wasleen
Approved DCD drawingsThe finalised DCD-approved drawing set, delivered once the final approval is received.Wasleen

Requirements change as authorities update their regulations. Confirm the current document list with us before submitting — this case reflects the documents required at the time of this engagement.

Planned vs Actual

How the quoted timeline compared with what actually happened on this engagement.

Proposed (planned)As-built (actual)
Planned versus actual timeline
StagePlannedActualNote
Quotation issued18 June 2026
Site visit & as-built collectionTo be confirmedNo timeline commitment is stated in quotation LML/QTN/1119-26
DCD drawings preparationTo be confirmedNo timeline commitment is stated in quotation LML/QTN/1119-26
Revisions & finalisationTo be confirmedRevisions required are included in the quoted fee
Final approvalTo be confirmedIndicative — typical DCD drawing approval timelines

Results

What this engagement delivered — limited to what the source documents actually support.

  • AED 4,500

    Quoted fee

  • Dubai Civil Defence (DCD)

    Approval authority

  • DCD as-built drawings preparation for a D3 showroom

    Scope

Need the same approval handled for you?

Get a free quote for your dcd as-built drawings preparation project — no obligation, no hidden fees.

Get Free Quote

Frequently Asked Questions

Common questions about Dubai Civil Defence approvals like this one.

The quotation covers conducting a site visit, collecting the site as-built and existing drawings and details, and preparing the DCD drawings as per the regulations, with any revision required included, as stated in quotation LML/QTN/1119-26.

The drawings are prepared for Dubai Civil Defence (DCD) approval of the ground-floor showroom at Building 5, Dubai Design District (D3), Dubai.

Because the showroom had already been fitted out, the DCD approval needs an as-built drawing set that records the actual built condition of the space, prepared as per Dubai Civil Defence regulations.

The client provides all other existing drawings, documents and green files, access for the site visit, and the building management NOC if it is required. Wasleen conducts the site visit, collects the as-built details and prepares the DCD drawing set.

Yes. Quotation LML/QTN/1119-26 states that any revision required while preparing the DCD drawings is included in the AED 4,500 fee.

Additional charges apply for exceptional approval requirements, an inspection failure or a design revision, and VAT is separate, as stated in the limiting conditions of quotation LML/QTN/1119-26. The price may also differ if an NOC is required from the building management.

No. Quotation LML/QTN/1119-26 does not state a completion window, so the programme depends on the as-built details collected, the documents supplied and the DCD review of the drawing set.

Payment is 50% in advance upon confirmation, 40% as progressive payments upon drawing handover and 10% as final payment upon receiving the final approval, as stated in quotation LML/QTN/1119-26.

Ready to Get Started?

Contact us today for a free consultation. We'll guide you through every step of the approval process.