DM & DCD Approval for Warehouse Merging in Dubai Investment Park
This case study covers the quoted Dubai Municipality (DM) and Dubai Civil Defence (DCD) approval for merging Warehouse 16 and 17 in Dubai Investment Park Second, Dubai. The AED 16,000 quotation from LML/QTN/1089 covers preparing drawings as per DM and DCD regulation, obtaining design approval from DM and DCD, and conducting the DM and DCD inspection that releases the completion certificate. The quotation was issued on 29 April 2026 and the approval scope is engaged but not yet claimed.

Project facts
- Authorities
- DM & DCD
- Quoted fee
- AED 16,000
- Scope
- Merging two warehouses
- Status
- Quotation issued
At a Glance
The core facts of this dm & dcd approval for merging two warehouse units approval engagement at a glance.
| Attribute | Value |
|---|---|
| Project type | DM & DCD approval for merging two warehouse units |
| Location | Dubai |
| Authority | Dubai Municipality, Dubai Civil Defence |
| Quoted fee | AED 16,000 |
| Status | Quote only |
| Source ref | LML/QTN/1089 |
The Challenge
Two companies in Dubai Investment Park Second needed approval from Dubai Municipality (DM) and Dubai Civil Defence (DCD) to merge Warehouse 16 and 17 into a single unit, quoted in LML/QTN/1089. Merging two warehouse units combines two approved spaces into one, so the revised layout and its fire safety design have to be re-approved by both authorities before the merged unit can be occupied. The AED 16,000 professional fee covers preparing drawings as per DM and DCD regulation, obtaining design approval from DM and DCD, and conducting the DM and DCD inspection that releases the completion certificate.
The quotation keeps the fee final with clear limits: the client supplies the existing drawings, documents and green files; exceptional approval requirements, an inspection failure or a design revision each carry an additional charge; and VAT is separate. Confirming the existing documents at the start is what protects the quoted AED 16,000 fee.
The Approval Timeline
Tap a step for detailsWhat We Did
The steps we followed to prepare and submit this approval — from drawing review to final submission.
Site visit and document collection
Collect the existing drawings, documents and green files based on the site condition and confirm the warehouse merging scope with the client.
Prepare drawings as per DM and DCD regulation
Prepare the revised layout drawings for the merged warehouse so they meet Dubai Municipality and Dubai Civil Defence regulation.
Obtain design approval from DM and DCD
Submit the revised drawings and obtain the design approval from Dubai Municipality and Dubai Civil Defence.
Conduct the DM and DCD inspection
Coordinate the inspection from DM and DCD for the merged warehouse unit and address any inspection comments.
Release the completion certificate
Once the inspection is approved, release the completion certificate for the merged warehouse unit.
This project combined our 2D Drawings, Approval Management and Document Clearing services to deliver a single, tracked submission from drawings through final inspection.
Documents & Requirements
The documents prepared or collected for this Dubai Municipality & Dubai Civil Defence submission, and who supplied each one.
| Document | Description | Provided by | |
|---|---|---|---|
| Existing drawings, documents and green files | Existing drawings, documents and green files for Warehouse 16 and 17 provided by the client. | Client | |
| Merged warehouse drawings | Revised layout drawings for the merged warehouse prepared as per DM and DCD regulation. | Wasleen | |
| DM and DCD design approval | Design approval obtained from Dubai Municipality and Dubai Civil Defence for the merged unit. | Wasleen | |
| DM and DCD inspection and completion certificate | Inspection conducted by DM and DCD and the completion certificate released for the merged warehouse. | Wasleen |
Requirements change as authorities update their regulations. Confirm the current document list with us before submitting — this case reflects the documents required at the time of this engagement.
Planned vs Actual
How the quoted timeline compared with what actually happened on this engagement.
| Stage | Planned | Actual | Note |
|---|---|---|---|
| Quotation issued | — | 29 April 2026 | — |
| Documents & drawings | Weeks 1–2 | — | Indicative — typical DM & DCD timelines |
| DM & DCD design approval | Weeks 3–5 | — | Indicative — typical DM & DCD timelines |
| DM & DCD inspection | Weeks 5–6 | — | Indicative — typical DM & DCD timelines |
| Completion certificate | Weeks 6–7 | — | Indicative — typical DM & DCD timelines |
Results
What this engagement delivered — limited to what the source documents actually support.
AED 16,000
Quoted fee
Dubai Municipality & Dubai Civil Defence
Approval authorities
Merging two warehouse units
Scope
Need the same approval handled for you?
Get a free quote for your dm & dcd approval for merging two warehouse units project — no obligation, no hidden fees.
Frequently Asked Questions
Common questions about Dubai Municipality & Dubai Civil Defence approvals like this one.
It covers preparing drawings as per DM and DCD regulation, obtaining design approval from Dubai Municipality and Dubai Civil Defence, and conducting the DM and DCD inspection that releases the completion certificate for the merged warehouse unit.
Dubai Municipality (DM) reviews the revised building layout and issues the completion certificate, and Dubai Civil Defence (DCD) reviews the fire safety design and joins the inspection.
Merging Warehouse 16 and 17 combines two approved spaces into a single unit, so the revised layout and its fire safety design have to be re-approved by DM and DCD before the merged unit can be occupied.
The client provides the existing drawings, documents and green files for Warehouse 16 and 17. Wasleen prepares the revised drawings, coordinates the DM and DCD submissions and conducts the inspection.
Additional charges apply for exceptional approval requirements, an inspection failure or a design revision, and VAT is separate.
Payment is 50% in advance before starting the work, 40% during work progress and 10% after completion, as stated in quotation LML/QTN/1089.
This case study reflects a quotation issued on 29 April 2026 for AED 16,000; the approval scope is engaged and the completion certificate is not yet claimed.
Related Case Studies
DM & DCD Approval for a Technical Services Company in Dubai
Dubai
View case studyDM & DCD Approval for an Apartment Fit-Out in Dubai Marina
Dubai Marina
View case studyRelated approvals
Explore the Dubai Civil Defense Approval requirements, Dubai Municipality NOC requirements, Dubai Municipality Completion Certificate requirements in detail.
Ready to Get Started?
Contact us today for a free consultation. We'll guide you through every step of the approval process.