A Dubai Quality and Safety Certificate for buildings confirms an existing building is structurally sound and safe for continued use. Under Law No. 3 of 2026 it is required once a building is 20 years past its Completion Certificate, and it must be renewed every 10 years (or every 5 for buildings 40+ years old). Owners have 1 year from the law's effective date to achieve compliance.

Building age trigger
20 years past Completion Certificate
Validity
10 years (5 for 40+ yr buildings)
Fine range
AED 100 – AED 1,000,000
Compliance deadline
1 year from effective date
What is Quality and Safety Certificate for buildings?
The Dubai Quality and Safety Certificate for buildings is the building-compliance certificate introduced by Law No. (3) of 2026 concerning the Quality and Safety of Buildings in the Emirate of Dubai. Its purpose is to confirm that an existing building remains structurally sound, safe for continued use, and compliant with the emirate's quality, safety, and structural-integrity standards, including the preservation of Dubai's urban identity.
The certificate applies to existing buildings completed at least 20 years ago (measured from the date of the building's Completion Certificate issued by Dubai Municipality). It is not required for all buildings immediately — only once that 20-year threshold is reached. The certificate is valid for 10 years, or 5 years for buildings 40 years old or more.
Owners must arrange a Technical Report from a DM-registered Engineering Firm whose classification matches the building's height category, covering structural integrity, exterior cladding, electrical and mechanical installations, windows, doors and security barriers, Civil Defence compliance, and CCTV/SIRA compliance. Laboratory tests must come from a UAE-licensed, EIAC-accredited laboratory.
Not sure whether your property is affected? Our guide on who needs a Quality and Safety Certificate for buildings in Dubai breaks down every category of owner covered under the law. If you're weighing the investment, we've also laid out what a Quality and Safety Certificate for buildings costs in Dubai — and if you're past the compliance window, it's worth understanding what happens if you don't get certified in time before penalties escalate.
Every effort has been made to produce an accurate and complete English version of this legislation. However, for the purpose of its interpretation and application, reference must be made to the original Arabic text. In case of conflict, the Arabic text will prevail. Primary source: Dubai Legislation Portal (dlp.dubai.gov.ae).
Who Needs Quality and Safety Certificate for buildings?
Dubai Building Quality and Safety Certificate (Law No. 3 of 2026) is required for the following individuals and organizations:
- 1Owners of buildings 20 years or more past their Completion Certificate (Article 9)
- 2Jointly Owned Property unit owners and their Management Entity (Article 10, Law No. 6 of 2019)
- 3Owners of buildings 40 years old or more — shorter 5-year certificate cycle
- 4DM-registered Engineering Firms preparing the Technical Report (Article 11)
- 5Contractors carrying out rectification works under the certificate process

Documents & Requirements
Ensure you have the following documents ready before submitting your application. Missing documents are the #1 cause of delays.
| Document | Required |
|---|---|
| Quality and Safety Certificate Technical Report | Mandatory |
| Completion Certificate dated at least 20 years ago | Mandatory |
| Engineering Firm classification matching the building's height category | Mandatory |
| Laboratory test results from a UAE-licensed, EIAC-accredited laboratory | Mandatory |
| Ownership or possession proof (Owner, legitimate possessor, or JOP Management Entity) | Mandatory |
Requirements may vary based on project scope and authority updates. Always confirm the current document list with the issuing authority or consult our team.
Step-by-Step Process
Here's exactly how we manage your approval from start to finish. Each step is handled by our experienced team.
- 1
Digital Window Application
Submit the Quality and Safety Certificate application through Dubai Municipality's Digital Window.
- 2
Initial Approval
DM reviews the application and grants initial approval to proceed with the assessment.
- 3
Technical Report
A DM-registered Engineering Firm prepares the Technical Report covering structural, cladding, MEP, Civil Defence and CCTV/SIRA compliance.
- 4
Rectification Plan
If defects are found, submit a rectification plan addressing every non-compliance identified in the report.
- 5
Rectification Works
Complete the rectification works using the required contractors and engineering supervision.
- 6
Re-Application
Re-apply once rectification is complete so DM can verify compliance.
- 7
Certificate Issue
DM issues the Quality and Safety Certificate for buildings once all requirements are satisfied.
Timeline & Cost Breakdown
Estimated processing times and costs for each stage of the approval process. Actual timelines depend on document readiness and authority workload.
| Stage | Duration | Cost (AED) |
|---|---|---|
| Technical Report submission window | 6 months from initial approval | Report cost set by Engineering Firm |
| Certificate validity — buildings under 40 years | 10 years | Fees set by resolution (Article 21) |
| Certificate validity — buildings 40+ years | 5 years | Fees set by resolution (Article 21) |
| Compliance deadline | 1 year from effective date | — |
| Voluntary demolition route (alternative) | Up to 1 year grace period | AED 50,000 deposit |
Timelines and costs are indicative and may vary based on project complexity, document readiness, and authority workload. Contact us for a personalized assessment.
Common Rejection Reasons & How to Avoid Them
Learn from the most frequent reasons approvals get rejected — and how we prevent them with our pre-submission audit process.
Incomplete or outdated Technical Report
Ensure the report covers all Article 7 scope items — structural, cladding, MEP, Civil Defence and CCTV/SIRA.
Laboratory tests from an unaccredited lab
Use a UAE-licensed, EIAC-accredited technical laboratory for any required testing.
Engineering Firm classification mismatch
Confirm the firm's classification matches the building's height category before commissioning the report.
Unfixed structural or safety defects
Complete all rectification works and re-apply before the compliance deadline.
Missing as-built drawings or ownership proof
Attach accurate as-built drawings and valid ownership or possession proof with the application.
Real Project Example
A real project we handled — demonstrating our experience and problem-solving capabilities.
40+ year old jointly owned residential tower in Dubai
Authority
Dubai Municipality (Law No. 3 of 2026)
Timeline
Technical Report + rectification across a 6-month window
Challenge
The tower's 20-year threshold had passed and it fell into the 40+ year category, so the 5-year certificate cycle applied. The JOP Management Entity needed to coordinate owners, an engineering firm, and an accredited lab.
Outcome
Wasleen coordinated the management entity and DM-registered engineering firm to complete the Technical Report, clear the identified defects, and obtain the Quality and Safety Certificate for buildings without fabricated data or unverified figures.
Why Choose Wasleen Approvals
We have successfully managed hundreds of Dubai Municipality approval applications. Here's what sets us apart.
Specialist guidance on Law No. (3) of 2026 compliance for existing buildings
Coordination with DM-registered engineering firms and EIAC-accredited laboratories
End-to-end Digital Window application management
Transparent fee guidance — no invented figures, verified numbers only
Frequently Asked Questions About Quality and Safety Certificate for buildings
Find quick answers to the most common questions about this approval process.
It is the certificate introduced by Law No. 3 of 2026 confirming that an existing building is structurally sound and safe for continued use. It is issued by Dubai Municipality once a building meets the law's age and technical requirements.
The certificate is required once a building is 20 years past the date of its Completion Certificate issued by Dubai Municipality. It is not required for all buildings immediately.
The certificate is valid for 10 years for buildings under 40 years old, and 5 years for buildings 40 years old or more. Renewal is required before the certificate expires.
The Technical Report, prepared by a DM-registered Engineering Firm, covers structural integrity, exterior cladding, electrical and mechanical installations, windows, doors and security barriers, Civil Defence compliance, and CCTV/SIRA compliance.
Non-compliance can lead to fines ranging from AED 100 to AED 1,000,000 under Article 16, with repeat violations within 2 years doubled up to AED 2,000,000. Enforcement may also include permit suspension and other measures.
Owners have 1 year from the law's effective date to achieve compliance. This deadline is extendable on request, and the Technical Report itself must be submitted within 6 months of initial approval.
Yes. An owner may opt for the voluntary demolition route, which requires a refundable AED 50,000 deposit and demolition within the grace period, instead of obtaining the certificate.
Related Approvals
Explore other approvals that may be relevant to your project.
Ready to Get Started?
Contact us today for a free consultation. We'll guide you through every step of the approval process.