DEWA Load Schedule Request for a Technical Services Company in Dubai

This case study covers the quoted request for an existing load schedule with Dubai Electricity and Water Authority (DEWA) for a technical services company project in Dubai. The AED 1,200 quotation from LML/QTN/1087 covers preparing and submitting the request for the existing load schedule and following up with DEWA until the schedule is issued. The quotation was issued on 27 April 2026 and the load schedule request is engaged but not yet delivered.

DEWA electricity connection approval process for a new property in Dubai
DEWA electricity connection approval process for a property in Dubai

Project facts

Authority
DEWA
Quoted fee
AED 1,200
Scope
Load schedule request
Status
Quotation issued

At a Glance

The core facts of this dewa existing load schedule request approval engagement at a glance.

Case study key facts
AttributeValue
Project typeDEWA existing load schedule request
LocationDubai
AuthorityDEWA
Quoted feeAED 1,200
StatusQuote only
Source refLML/QTN/1087

The Challenge

A technical services company in Dubai needed the existing load schedule for its premises from Dubai Electricity and Water Authority (DEWA), quoted in LML/QTN/1087. The existing load schedule records the connected load on the DEWA account and is the baseline DEWA uses before any change in the electrical load, such as a load enhancement, a meter change or a new connection, can be processed. The AED 1,200 professional fee covers preparing the request for the existing load schedule based on the client's drawings, documents and approved drawings, submitting it to DEWA and following up until the schedule is issued.

The quotation keeps the fee final with clear limits: the client supplies the existing drawings, documents and approved drawings; a design revision or an authority approval after the first approval carries an additional charge; and third-party services, authority submission payments and insurance are excluded from the fee.

The Approval Timeline

Tap a step for details

What We Did

The steps we followed to prepare and submit this approval — from drawing review to final submission.

  1. Collect the required documents

    Collect the existing drawings, documents and approved drawings that the client provides for the load schedule request.

  2. Prepare and submit the load schedule request

    Prepare the request for the existing load schedule and submit it to Dubai Electricity and Water Authority on the client's behalf.

  3. Follow up and deliver the load schedule

    Follow up with DEWA until the existing load schedule is issued and deliver the issued schedule to the client.

This project combined our 2D Drawings, Approval Management and Document Clearing services to deliver a single, tracked submission from drawings through final inspection.

Documents & Requirements

The documents prepared or collected for this DEWA submission, and who supplied each one.

Documents and requirements for this approval
DocumentDescriptionProvided by
Existing drawings and approved drawingsExisting drawings, documents and approved drawings that the client provides for the load schedule request.Client
Load schedule requestRequest for the existing load schedule prepared based on the client's drawings and documents.Wasleen
DEWA submission and follow-upSubmission to Dubai Electricity and Water Authority and follow-up until the load schedule is issued.Wasleen
Issued load scheduleExisting load schedule issued by DEWA and delivered to the client.Wasleen

Requirements change as authorities update their regulations. Confirm the current document list with us before submitting — this case reflects the documents required at the time of this engagement.

Planned vs Actual

How the quoted timeline compared with what actually happened on this engagement.

Proposed (planned)As-built (actual)
Planned versus actual timeline
StagePlannedActualNote
Quotation issued27 April 2026
Document collectionDays 1–2Indicative — typical DEWA timelines
Load schedule requestDays 2–5Indicative — typical DEWA timelines
Load schedule issuedDays 5–7Indicative — typical DEWA timelines

Results

What this engagement delivered — limited to what the source documents actually support.

  • AED 1,200

    Quoted fee

  • Dubai Electricity & Water Authority (DEWA)

    Approval authority

  • Existing load schedule request

    Scope

Need the same approval handled for you?

Get a free quote for your dewa existing load schedule request project — no obligation, no hidden fees.

Get Free Quote

Frequently Asked Questions

Common questions about DEWA approvals like this one.

It covers preparing and submitting the request for the existing load schedule based on the client's drawings, documents and approved drawings, and following up with DEWA until the existing load schedule is issued.

Dubai Electricity and Water Authority (DEWA) issues the existing load schedule for the premises in Dubai.

The client provides the existing drawings, documents and approved drawings that DEWA requires for the load schedule request.

Additional charges apply for a design revision or an authority approval after the first approval, and third-party services, authority submission payments and insurance are excluded from the fee.

Payment is 100% in advance plus 5% VAT, payable by cheque to LIMINAL ARC INTERIORS LLC – DEWA, as stated in quotation LML/QTN/1087.

This case study reflects a quotation issued on 27 April 2026 for AED 1,200; the load schedule request is engaged and the schedule is not yet claimed.