Q&A

Quality and Safety Certificate Validity & Renewal in Dubai

Quality and Safety Certificate validity in Dubai: 10 years for buildings under 40, 5 years for older. Renewal process and fines up to AED 1,000,000. Contact us.

By Jamsheed Khalid — Senior Fit-Out Consultant

Back to Dubai Building Quality and Safety Certificate (Law No. 3 of 2026)

At a glance

Under Dubai's Law No. (3) of 2026, the Quality and Safety Certificate for buildings is valid for 10 years for buildings under 40 years old and 5 years for buildings 40 years or older. Building owners must renew the certificate before expiry, with renewal requiring a new Technical Report from a DM-registered engineering firm.

Approval consultant meeting with a client about Dubai permit requirements
Permit consultation in Dubai

Quality and Safety Certificate Validity in Dubai

Under Dubai's Law No. (3) of 2026, the Quality and Safety Certificate for buildings has a defined validity period that depends on the building's age. This certificate is mandatory for existing buildings that have reached 20 years since their Completion Certificate date. The validity period is a key factor in planning your renewal cycle.

Building AgeCertificate ValidityRenewal Requirement
Under 40 years old10 yearsNew Technical Report required
40 years or more5 yearsNew Technical Report required

These validity periods are set by the law to ensure regular safety assessments. For buildings under 40 years, the 10-year validity balances safety with practicality. For older buildings, the 5-year validity reflects the need for more frequent inspections. Renewal is not automatic – you must initiate the process before the certificate expires.

For help obtaining your certificate, Wasleen Approvals manages the full Dubai Building Quality Safety Certificate process — from Technical Report preparation to submission and follow-up until approval.

Renewal Process for Quality and Safety Certificate for buildings in Dubai

Renewing your Quality and Safety Certificate for buildings involves a structured process. The key steps are:

The Technical Report must cover structural integrity, exterior cladding, electrical and mechanical installations, windows, doors, security barriers, Civil Defence compliance, and CCTV/SIRA compliance. The engineering firm must be classified for your building's height category per Dubai Municipality thresholds.

Quality and Safety Certificate for buildings renewal process in Dubai
Renewal process for Quality and Safety Certificate for buildings in Dubai

For more detail, see our guide on Buildings Over 40 Years and the Safety Certificate in Dubai.

Fines for Non-Renewal and Violations

Failure to renew your Quality and Safety Certificate for buildings on time can result in significant fines. The law sets a fine range of AED 100 to AED 1,000,000 per violation. For repeat violations within 2 years, the fine is doubled, with a maximum cap of AED 2,000,000.

Violation TypeFine Range (AED)
First violation100 – 1,000,000
Repeat violation within 2 yearsUp to 2,000,000 (doubled cap)

Exact per-violation amounts will be determined by a follow-up Executive Council Chairman resolution. Until then, the statutory range applies. If you choose to demolish the building instead of certifying, a refundable security deposit of AED 50,000 is required, and demolition must be completed within 1 year.

For more detail, see our guide on How to Get a Building Safety Certificate in Dubai (Step-by-Step).

Compliance Deadlines and Grace Periods

The law came into force 60 days after publication in the Official Gazette. Building owners have 1 year from the effective date to comply, and this deadline can be extended. Understanding these timelines is crucial to avoid penalties.

MilestoneTimeline
Law in force after publication60 days
Compliance deadline (extendable)1 year from effective date
Technical Report submission window6 months from initial approval
Technical Report extension (on request)Up to 2 years
Occupant vacation window after approval3 months
Demolition grace periodUp to 1 year

If you receive an approval for your Technical Report, occupants must vacate within 3 months. For voluntary demolition, you have up to 1 year. Grievances or appeals must be filed within 30 days.

For more detail, see our guide on Law 3 of 2026 Compliance Deadline in Dubai — Key Dates.

Required Documents for Renewal

To renew your certificate, you will need to submit a set of documents. These include:

  • Quality and Safety Certificate Technical Report (from a DM-registered engineering firm)
  • Completion Certificate date (must be at least 20 years old)
  • Engineering firm classification (matching building height category)
  • Laboratory test results (from a UAE-licensed, EIAC-accredited lab, if required)
  • Ownership or possession proof (owner, legitimate possessor, or JOP management entity)

Ensure all documents are current and meet the specific requirements of Dubai Municipality. Our team at Wasleen Approvals can guide you through the documentation process.

Why Choose Wasleen Approvals for Your Renewal

Navigating the renewal process can be complex. Wasleen Approvals specializes in obtaining and renewing Quality and Safety Certificates for buildings in Dubai. We handle the paperwork, coordinate with engineering firms, and ensure compliance with the latest regulations. For expert assistance, visit our service page:

Quality and Safety Certificate service: /approvals/dubai-building-quality-safety-certificate

Related Dubai approvals

Frequently Asked Questions