Building management entities must ensure their buildings obtain a Quality and Safety Certificate for buildings if the building is 20 years or older. They must also submit a Technical Report prepared by a DM-registered engineering firm, ensure compliance with Civil Defence and SIRA requirements, and renew the certificate every 10 years (if under 40 years old) or every 5 years (if 40 years or older). Non-compliance can lead to fines up to AED 1,000,000.
Building Management Obligations Under Law 3 of 2026 Dubai
Understand building management obligations under Law 3 of 2026 Dubai. Fines up to AED 1M. Get compliance guidance from Wasleen Approvals. Contact us today.
By Jamsheed Khalid — Senior Fit-Out Consultant
Back to Dubai Building Quality and Safety Certificate (Law No. 3 of 2026)At a glance
Under Law No. (3) of 2026 on Quality and Safety of Buildings in Dubai, building management entities (including Jointly Owned Property management entities) must ensure their buildings obtain a Quality and Safety Certificate for buildings if the building is 20 years or older. This certificate is valid for 10 years for buildings under 40 years, and 5 years for buildings 40 years or older. Non-compliance can result in fines ranging from AED 100 to AED 1,000,000, with repeat violations within 2 years doubling the fine up to AED 2,000,000. The law came into force 60 days after its publication in the Official Gazette, and compliance is required within 1 year of the effective date.

Overview of Law 3 of 2026 and Building Management Obligations
Law No. (3) of 2026 on Quality and Safety of Buildings in Dubai introduces significant responsibilities for building management entities, including Jointly Owned Property (JOP) management entities. This law mandates that existing buildings completed at least 20 years ago must obtain a Quality and Safety Certificate for buildings. For building managers, this means initiating technical assessments, coordinating with Dubai Municipality-registered engineering firms, and ensuring compliance within the set timelines. Failure to meet these obligations can result in fines ranging from AED 100 to AED 1,000,000 per violation, with repeat violations within 2 years doubling the fine up to AED 2,000,000.
Who is a Building Management Entity under Law 3 of 2026?
The law applies to building owners, legitimate possessors, and for jointly owned properties, the management entity established under Law No. (6) of 2019. This entity, often referred to as the JOP management entity, is responsible for the day-to-day management and maintenance of common areas and building systems. Under Law 3 of 2026, this entity must ensure that the building obtains the Quality and Safety Certificate for buildings within the prescribed compliance period. This includes preparing the required technical reports and coordinating with qualified engineering firms.
The law is now in force, and the compliance deadline is 1 year from the effective date, which can be extended. Building managers should act promptly to assess their buildings' status and begin the certification process. For detailed guidance on the certificate, refer to our service page on the Dubai Building Quality and Safety Certificate.
For help obtaining your certificate, Wasleen Approvals manages the full Dubai Building Quality Safety Certificate process — from Technical Report preparation to submission and follow-up until approval.
Key Obligations for Building Managers
Building management entities have specific duties under Law 3 of 2026. These obligations are not optional; they are legal requirements with significant penalties for non-compliance. The table below summarizes the core duties and associated deadlines.
| Obligation | Description | Timeline / Validity |
|---|---|---|
| Obtain Quality and Safety Certificate for buildings | For buildings completed at least 20 years ago, a certificate must be obtained from the Dubai Municipality. | Compliance within 1 year from effective date (extendable) |
| Submit Technical Report | A detailed report prepared by a DM-registered Engineering Firm covering structural integrity, cladding, electrical/mechanical systems, and Civil Defence compliance. | Must be submitted within 6 months from initial approval; extension up to 2 years on request |
| Renew Certificate | Renewal is required based on building age. | Under 40 years: valid 10 years; 40 years or more: valid 5 years |
| Vacate Building if Required | If the technical report requires major rectification, occupants may need to vacate. | Within 3 months after Technical Report approval |
| Demolition Option | If demolition is chosen instead of certification, a refundable security deposit is required. | Demolition within up to 1 year grace period; deposit AED 50,000 |
Building managers must also ensure that the engineering firm engaged has the correct classification matching the building's height category, as per Dubai Municipality thresholds. Laboratory test results, if required, must come from UAE-licensed, EIAC-accredited laboratories. These requirements are critical to avoid delays and fines.
For more detail, see our guide on Jointly Owned Property & the Safety Certificate in Dubai.
Fines and Penalties for Non-Compliance
Non-compliance with Law 3 of 2026 can lead to severe financial penalties. The law sets a broad fine range, and specific amounts are determined by a follow-up Executive Council Chairman resolution. The table below outlines the fine structure.
| Violation Type | Fine Range (AED) | Notes |
|---|---|---|
| Any violation | 100 – 1,000,000 | Per violation, as per Article 16 |
| Repeat violation within 2 years | Up to 2,000,000 | Double the original fine, capped at AED 2,000,000 |
The exact fine per violation type is not yet published; it will be set by the Executive Council Chairman resolution. Building managers must stay updated with official announcements from the Dubai Legislation Portal (dlp.dubai.gov.ae) to ensure full compliance.
To avoid these penalties, it is advisable to engage a professional approval consultancy. Wasleen Approvals can assist in navigating the certification process, ensuring all documents are in order, and meeting deadlines.
For more detail, see our guide on Landlord Obligations Under Dubai's Building Safety Law 2026.
Steps to Achieve Compliance
Building managers should follow a systematic approach to comply with Law 3 of 2026. The steps below outline the process from assessment to certification.

For professional assistance, consider consulting with Wasleen Approvals. Our experts can manage the entire process, from document preparation to submission, ensuring timely compliance.
For more detail, see our guide on Building Safety Certificate Compliance Checklist in Dubai.
Important Documents for Building Managers
Building managers must prepare and maintain specific documents to demonstrate compliance. The following list outlines the key documents required.
- Quality and Safety Certificate Technical Report: Prepared by a DM-registered Engineering Firm, covering all required aspects.
- Completion Certificate date: Must be at least 20 years old to trigger the certificate requirement.
- Engineering Firm classification: Must match the building's height category per Dubai Municipality thresholds.
- Laboratory test results: From a UAE-licensed, EIAC-accredited technical laboratory where testing is required.
- Ownership or possession proof: For the owner, legitimate possessor, or the JOP management entity under Law No. (6) of 2019.
Ensure all documents are up-to-date and readily available for submission. Missing or incorrect documents can delay the process and lead to fines.
How Wasleen Approvals Can Help
Navigating Law 3 of 2026 can be complex. Wasleen Approvals specializes in approval consultancy in Dubai, offering expert guidance on building compliance. We help building managers understand their obligations, prepare the necessary documentation, and obtain the Quality and Safety Certificate for buildings efficiently. Our services ensure you meet all legal requirements, avoiding costly fines and delays.
Contact us today to discuss your building's compliance needs. Our team is ready to assist you with every step of the process.
Related Dubai approvals
You may also need these related Dubai approvals:
Frequently Asked Questions
The law came into force 60 days after its publication in the Official Gazette. You have 1 year from the effective date to comply, and this period can be extended. For the Technical Report, you have 6 months from initial approval, with an extension of up to 2 years available on request.
Fines range from AED 100 to AED 1,000,000 per violation, as set by Article 16. If a repeat violation occurs within 2 years, the fine is doubled, up to a maximum of AED 2,000,000. The exact amount per violation type will be determined by a follow-up Executive Council Chairman resolution.
No, only buildings that were completed at least 20 years ago require the certificate. The certificate is valid for 10 years for buildings under 40 years old, and 5 years for buildings 40 years or older. Newer buildings are not immediately affected.
You need a Technical Report from a DM-registered Engineering Firm, proof of the Completion Certificate date, the engineering firm's classification, laboratory test results (if required) from an EIAC-accredited lab, and ownership or possession proof. These documents are essential for the certification process.
Related pages
Explore related approvals and guides for complete requirements, documents, and timelines.
Dubai Building Quality and Safety Certificate (Law No. 3 of 2026)
Full approval requirements, documents, and timeline
Jointly Owned Property & the Safety Certificate in Dubai
Related guide
Landlord Obligations Under Dubai's Building Safety Law 2026
Related guide
Building Safety Certificate Compliance Checklist in Dubai
Related guide
Contractor Responsibilities Under Law 3 of 2026 Dubai
Related guide