Documents Required for Quality and Safety Certificate for buildings in Dubai
Need documents for Quality and Safety Certificate for buildings in Dubai? Find the full list under Law No. (3) of 2026. Get expert guidance from Wasleen Approvals.
By Jamsheed Khalid — Senior Fit-Out Consultant
Back to Dubai Building Quality and Safety Certificate (Law No. 3 of 2026)At a glance
Under Dubai's Law No. (3) of 2026, obtaining a Quality and Safety Certificate for buildings at least 20 years old requires a technical report from a DM-registered engineering firm, proof of ownership, and laboratory test results. The certificate is valid for 10 years for buildings under 40 years old and 5 years for older buildings, with compliance required within one year of the law's effective date.

Introduction to Quality and Safety Certificate for buildings Documents in Dubai
Dubai's Law No. (3) of 2026 on Quality and Safety of Buildings mandates that existing buildings completed at least 20 years ago must obtain a Quality and Safety Certificate for buildings. This certificate confirms that a building meets structural, fire safety, and security standards. To apply, you must submit a specific set of documents, which we outline below, based on the official requirements.
The required documents are designed to verify the building's integrity and compliance. They include a technical report, proof of ownership, and laboratory test results, among others. Understanding these requirements is crucial for building owners, especially those approaching the 20-year threshold. For expert assistance, consider our Dubai Building Quality and Safety Certificate service.
Essential Documents for the Quality and Safety Certificate for buildings
The core document is the Quality and Safety Certificate Technical Report, prepared by a DM-registered engineering firm. This report covers structural integrity, exterior cladding, electrical and mechanical installations, windows, doors, security barriers, Civil Defence compliance, and CCTV/SIRA compliance. The engineering firm must have the appropriate classification matching your building's height category.
Document Checklist
| Document | Description | Key Requirement |
|---|---|---|
| Technical Report | Comprehensive assessment by a DM-registered engineering firm | Must cover structural, electrical, mechanical, and fire safety aspects |
| Completion Certificate | Original certificate indicating the building's completion date | Must be at least 20 years old to trigger the certificate requirement |
| Engineering Firm Classification | Proof that the firm is classified for your building's height | Must match Dubai Municipality height thresholds |
| Laboratory Test Results | Reports from a UAE-licensed, EIAC-accredited laboratory | Required where testing is necessary |
| Ownership or Possession Proof | Title deed, tenancy contract, or management entity authorization | Owner, legitimate possessor, or Jointly Owned Property Management Entity under Law No. (6) of 2019 |

For more detail, see our guide on How to Get a Building Safety Certificate in Dubai (Step-by-Step).
Technical Report: The Core Document
The Technical Report is the most critical document in your application. It must be prepared by a Dubai Municipality (DM)-registered engineering firm and includes a detailed assessment of the building's systems. The report must verify that the building meets all safety and quality standards set by Law No. (3) of 2026.
- Contact a DM-registered engineering firm and provide your building's details.
- The firm conducts a thorough inspection covering structural, electrical, mechanical, and fire safety systems.
- The firm prepares the Technical Report, including any laboratory test results from an EIAC-accredited lab.
- Submit the report along with other required documents to the Dubai Municipality or via the Dubai Legislation Portal (dlp.dubai.gov.ae).
For more detail, see our guide on Building Safety Certificate Compliance Checklist in Dubai.
Additional Documents and Compliance Details
Beyond the technical report, you must provide proof of ownership or legal possession. This can be a title deed, a tenancy contract, or authorization from the Jointly Owned Property Management Entity. If your building is older than 40 years, the certificate validity is shorter, so ensure your documents are up to date.
Laboratory test results are required when the engineering firm deems testing necessary. These tests must be conducted by a UAE-licensed laboratory accredited by EIAC. The results are included in the Technical Report, so ensure your firm coordinates with an accredited lab. For related drawing approvals, see our as-built drawing approval page.
Process for Submitting Documents
Once you have all documents, the submission process is straightforward. The law requires that the Technical Report be submitted within 6 months of initial approval, with an extension possible up to 2 years if needed. After approval, occupants have 3 months to vacate if the report indicates issues.
- Gather all required documents as per the checklist.
- Submit the application and documents to the Dubai Municipality via the official portal.
- The authority reviews and may request additional information.
- Once approved, the Quality and Safety Certificate for buildings is issued with a validity of 10 years (under 40 years old) or 5 years (40 years or more).
Fines and Penalties for Non-Compliance
Failure to obtain the Quality and Safety Certificate for buildings within the compliance period can result in fines ranging from AED 100 to AED 1,000,000 per violation. Repeat violations within 2 years double the fine, capped at AED 2,000,000. The exact amounts are pending an Executive Council Chairman resolution.
| Violation Type | Fine Range | Notes |
|---|---|---|
| Any violation | AED 100 – AED 1,000,000 | Per Article 16 of Law No. (3) of 2026 |
| Repeat violation within 2 years | Up to AED 2,000,000 | Double the original fine, capped at AED 2,000,000 |
If you choose to demolish the building instead of certifying, a refundable security deposit of AED 50,000 is required, and the demolition must be completed within a grace period of up to 1 year. The certificate fees themselves are set by Executive Council Chairman resolution, so they are not fixed in the law.
How Wasleen Approvals Can Help
Wasleen Approvals specializes in navigating Dubai's approval processes. We can help you compile the correct documents, engage with Dubai Municipality, and ensure your application meets all requirements under Law No. (3) of 2026. Our team ensures a smooth process, saving you time and avoiding penalties.
Every effort has been made to produce an accurate and complete English version of this legislation. However, for the purpose of its interpretation and application, reference must be made to the original Arabic text. In case of conflict, the Arabic text will prevail.
Frequently Asked Questions
The Technical Report must be prepared by a Dubai Municipality (DM)-registered engineering firm. The firm must have the appropriate classification matching your building's height category, and it will conduct a comprehensive assessment of structural, electrical, mechanical, and fire safety systems.
The certificate is valid for 10 years for buildings under 40 years old, and 5 years for buildings that are 40 years or older. The validity period is determined by the building's age as per the Completion Certificate date.
The law came into force 60 days after its publication in the Official Gazette, and compliance is required within 1 year from the effective date. This deadline is extendable, but it's advisable to start the process early to avoid fines.
Fines range from AED 100 to AED 1,000,000 per violation. Repeat violations within 2 years double the fine, capped at AED 2,000,000. The exact per-violation amounts are pending an Executive Council Chairman resolution.
Yes, you can opt to demolish the building instead of certifying. You must pay a refundable security deposit of AED 50,000, and the demolition must be completed within a grace period of up to 1 year.
Related pages
Explore related approvals and guides for complete requirements, documents, and timelines.
Dubai Building Quality and Safety Certificate (Law No. 3 of 2026)
Full approval requirements, documents, and timeline
As-Built Drawing Approval (Dubai)
Approval requirements and timeline
How to Get a Building Safety Certificate in Dubai (Step-by-Step)
Related guide
Building Safety Certificate Compliance Checklist in Dubai
Related guide
Building Inspection Process Under Law 3 of 2026 in Dubai
Related guide
Building Safety Certificate Cost in Dubai (2026 Fee Guide)
Related guide